loader

Total Products

195

Total Product Categories

455

Total Production

700

Avg. Production per day

  • Total Staff 792
  • Permanent Staff 692
  • Contractual Staff 100
  • Absent Staff 25
Assembly Line 1
Assembly Line 2
Shift 1 (9:30am - 5:30pm)
In Progress
Total Production: 700
Assgined Staff: 65
Assembly Line 3
Shift 1 (9:30am - 5:30pm)
In Progress
Total Production: 700
Assgined Staff: 65
Assembly Line 4
Shift 1 (9:30am - 5:30pm)
In Progress
Total Production: 700
Assgined Staff: 65

Assembly Line Activity

  • Station 1
    Raw Material
  • Station 2
    Pre-filter and Pump Assembly
  • Station 3
    Membrane Housing and Tubing
  • Station 4
    Control Panel and Electronics Integration
  • Station 5
    Final Assembly and Sealing
  • Station 6
    Quality Testing
  • Station 6
    Packaging

Shift Plan Calendar

Drag and drop your event or click in the calendar.

Modal 2 Production
Modal 6 Production
Modal 4 Production
Modal 1 Production

© Copyright 2024. All rights reserved.